Construction of a swimming pool for Sayed Ensar
During the 7 x 3 prefabricated swimming pool construction operations we carried out in Kurtkoy, Istanbul, our company is drilling and forming the reinforced concrete infrastructure and assembling our steel panels, placing the concrete on the feet of the steel panels fixed to the ground, filling the soil and installing the curing system, application. Plexi waterfall for salt device and salt generator installation by our company. In addition, the pool deck was applied by our company teams, and the pool heat pump was used as the heating system for the swimming pool.